A hopefully up-to-date page outlining a bunch of the things taking my time and thoughts over this quarter is is currently manually created from my quarterly/annual plans, with latest, current at the top.
2026/03 - 2026/06
End of an era:
- Meesh's grandad passed away end Feb, and she's executor of will, so lots of learnings around dealing with funerals and estates and other heavy stuff.
- Big energy heating and backup power core hardware largely done now, still wiring, sensors, software and tidying etc.
So hopefully the end to a particularly challenging and unpleasant 6 - 18 months
Spring stuff:
- compost, trim hedges, weed/turnover/plant any beds
- clean windows, gutters, roof
- do any tree stuff
Try and get order restored after chaotic year start:
- pickup good routines again (particularly exercise, sleep and task management.)
- throw out old stuff and integrate inherited stuff
Finish paths:
- get last flags down
- dig and line path round outside of garden
- gather up all mulch and wood chips and redistribute
1dom.fun
- get back to writing/updating more
- actually get fedify/staging onto prod
- rerun jobs to build oracle edge stuff on ARM
Soon/next
house stuff:
- gable end insulation, still
- garage, now no trades in there for a while, workbench, attic boxing etc.
- decide details for Big energy plan 2, PV and EV.
2025/10/01 - 2026/02/01
Big energy heating chaos.
- main installer went AWOL after 3 months of work on something that was quoted "5 days at start of Sept"
- working with Viessmann to try get everything finished and working.
Big energy electricity chaos.
- house battery expansion in, autochangeover didn't work as promised ("instantaneous")
- alternative solution of plugin UPS to handle changeover proposed
Install some PV panels myself.
Also upgraded phones (Pixel 9A for Meesh and Fairphone 6 for me)
All paths nearly done now:
- last 2 flag remaining on path round outside
- weed sheets down and for remaining garden paths
Soon/next
Soon, birthday & bankholiday seasons, so productivity slows.
Spring seasonal stuff: compost, hedges, weeding,
Garage:
- purge junk (skip) and make usable now 95% of heating'/energy stuff is in there.
2025/07/01 - 2025/10/01
Stain the decking
Big-energy:
- heatpump and solar thermal to be installed in Sept 2025
- also looking to maybe slip a few pv panels on garage
- and also need to get a computer in the garage to speak directly to inverter
- insulating gable end wall (probably slightly late)
1dom.fun:
- trying to get 1dom.fun markdown x activity pub (with fedify) live at 1dom.fun
- looking to get just current markdown notes + ability to receive and serve over activitypub as @itsdom@1dom.fun
path round the outside:
- started at beginning of month
- last section will be laid after heatpump is installed
Remainder of year
Big-energy:
- installing an extra battery or 2 and switching tariffs
- sort out heating automation, Viessman, HomeAssistant, TRVs etc.
Garage:
- mini server & utilities room
Seasonal stuff:
- gutters/drains, wood,
Dartboard
Christmas